It looks like you're enjoying our bodybuildng forum but haven't created an account yet. Why not take a minute to register for your own free account now? As a member you get free access to all of our bodybuilding forums and posts plus the ability to post your own messages, communicate directly with other members and much more. Register now!

Already a member? Login at the top of this page to stop seeing this message.

Iron Addict's Basic Sled Pulling Schedule



Reply
 
Thread Tools Display Modes
  #1  
Old 03-16-2006, 08:58 PM
_Wolf_'s Avatar
_Wolf_ _Wolf_ is offline
Rank: Light Heavyweight
 
Join Date: Jul 2005
Location: Trinity University, San Antonio, Texas
Posts: 4,794
Send a message via MSN to _Wolf_
Default Iron Addict's Basic Sled Pulling Schedule

hi, this too is from Iron Addict's

Here is a solid way to break into sled pulling without impacting recovery. Yes, you can just start out dragging 200 lbs for 15 minutes a couple times a week, but expect to grossly overtrain and watch your lifts go down. If you implement a schedule much like the one outlined here you will get into shape pretty fast, and most importantly, your weight training sessions will not be effected.

If you are a 150-300 lb squatter:

Two days a week, your choice of days. But try to at least pull the day AFTER you do squats.

Use 50 lbs on the sled, assuming a sled weight of 40-45 lbs for all days

Week one-two for 5 minutes with only 1-2 very SHORT breathers.

Week 3 seven and a half minutes.

Weeks 4-5 ten minutes.

Week 6, 12.5 minutes.

Weeks 7-8, 15 minutes.

Weeks 9-10 add 20 lbs.

Weeks 11-12, either go up in frequency, or up in minutes. This means either go to 20 minute sessions, or add a day. At this point, you may also add a heavy day. That is defined as pulling a weight between 150-350 lbs for four 50 yard passes.


If you are a 300-600 lb squatter:

Two days a week, your choice of days. But try to at least pull the day AFTER you do squats.

Use 70 lbs on the sled, assuming a sled weight of 40-45 lbs for all days

Week one-two for 5 minutes with only 1-2 very SHORT breathers.

Week 3 seven and a half minutes.

Weeks 4-5 ten minutes.

Week 6, 12.5 minutes.

Weeks 7-8, 15 minutes.

Weeks 9-10 add 20 lbs.

Weeks 11-12, either go up in frequency, or up in minutes. This means either go to 20 minute sessions, or add a day. At this point, you may also add a heavy day. That is defined as pulling a weight between 150-350 lbs for four 50 yard passes.


If you are a 600-900 lb squatter:

Two days a week, your choice of days. But try to at least pull the day AFTER you do squats.

Use 90 lbs on the sled, assuming a sled weight of 40-45 lbs for all days

Week one-two for 5 minutes with only 1-2 very SHORT breathers.

Week 3 seven and a half minutes.

Weeks 4-5 ten minutes.

Week 6, 12.5 minutes.

Weeks 7-8, 15 minutes.

Weeks 9-10 add 20 lbs.

Weeks 11-12, either go up in frequency, or up in minutes. This means either go to 20 minute sessions, or add a day. At this point, you may also add a heavy day. That is defined as pulling a weight between 150-350 lbs for four 50 yard passes.


Iron Addict
__________________

To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.



To view links or images in signatures your post count must be 10 or greater. You currently have 0 posts.
Reply With Quote
Reply

  Bodybuilding.net - Bodybuilding Forum > Main Forums > Training


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 



 



All times are GMT -8. The time now is 04:51 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.